Helen

Electric boiler project

Fimpec acts as the main consultant in Helen’s Hanasaari electric boiler project and is responsible for project management, engineering and procurement as an EPCM consultant.

Market

Clean Energy

Services

Engineering
Project & Construction Management

About the project

Helen has set a goal to become a carbon-neutral energy company by 2030. To increase carbon-neutral heat production, Helen is constructing an electric boiler solution with a district heating capacity of 140 MW at the Hanasaari heating plant. The Hanasaari heating plant in Helsinki is a boiler plant built in 2008 with six oil boilers for peak load and reserve production of district heating.

To increase sustainable energy production, three hot water electrode boilers with process auxiliary equipment will be installed in the boiler room of the heating plant.

The electric boiler project will utilize the existing district heating and electricity grid infrastructure in the area, as well as the 110 kV electricity grid connection and generator transformer released from the Hanasaari B power plant, which can be used for the electric boilers’ power supply.

The electric boiler project is scheduled to be completed by the end of 2024.

Fimpec’s role in the project

The project commenced for Fimpec in April 2023. Fimpec acts as the main consultant in the project using the EPCM implementation method, and is responsible for engineering project management, procurement, and construction management.

As Mentioned

The EPCM implementation method was chosen as a new solution for the electric boiler project

“We have collaborated with Helen before, but the EPCM implementation method was chosen as a new solution for the electric boiler project. The implementation method has enabled flexible solutions tailored to client’s needs, and we continue on the proven track in the project. I feel that the energy expertise of Fimpec’s professionals and its ongoing development will facilitate our operations in similar projects in the future amidst this new era of energy transition,” Fimpec’s Business Unit Director Sami Nissinen says.

“Helen perceives the EPCM implementation method as apt for the execution of projects of this nature. The basic and pre-engineering as well as procurement have progressed on schedule, and the construction site is also progressing accordingly,” says Helen’s Senior Project Manager Timo Saarnio.